UPS
& Battery Maintenance
Let
the factory-trained and certified Powerware technicians, with access
to the latest firmware and calibration software, maintain both the
UPS electronics and batteries. With predictive analysis and monitoring,
Eaton can identify potential problems before they occur, reducing
UPS and battery downtime.
Computer Room AC Maintenance
Our
HVAC technicians are factory trained and certified to work on the
full range of Data Aire equipment and controls. Ensure your precision
cooling system is working optimally with a regular maintenance plan.
Integrated System
Testing
A
variety of components and systems power, cool, and protect your
mission-critical facility. It is the sum of these pieces that makes
an integrated infrastructure. A deficiency in one component can
compromise the operation and performance of the whole.
Core Power's Integrated System Testing ensure that
each component of the mission-critical infrastructure performs precisely
as prescribed, individually, and as an integrated system.
|
 |

|

|
Power
Quality Survey
The
process of providing reliable power starts with periodic power quality
site surveys. These surveys help pinpoint and resolve problems that
can lead to unreliable performance, equipment damage, hazardous
conditions, and lowered productivity and profitability.
Infrared Scans
Infrared inspections reduce unexpected electrical
and mechanical equipment failures. Infrared Thermography analysis
detects abnormal temperatures that may signify corrosion, damaged
wiring, loose connections, and/or insulation breakdown. This vital
information alerts customers in advance of problems, reducing repair
costs and downtime.
Load Bank Testing
Core Power conducts a full range of load testing services.
Load testing your UPS or Generator System is critical to determine
the reliability of your power system. Load testing serves three
important purposes: To prove your system is capable of supporting
full rated load, capacity testing your batteries for the specified
runtime, reveal any internal connection issues.
Computer Room
Cleaning
The benchmark for optimum and safe operating levels
is compared to Federal Standard 209(E) for data centers at 100,000
microns at 0.5 particles per cubic foot of space. Does your computer
room meet these standards? Our cleaning service often save you more
by identifying issues that cost more than our service alone. So
have our professionals clean your room for you?
|